New Policy for Installing Multiple Electricity Meters at One Home – WAPDA Rules 2025

By: CM Team

On: Saturday, November 22, 2025 1:40 AM

New Policy for Installing Multiple Electricity Meters at One Home
Google News
Follow Us

Confusion is over. In 2025, the Power Division clarified that there is no blanket ban on installing more than one electricity meter at the same address. You can still apply for a second or even third meter if your home has truly separate portions. This is a big relief for joint families, landlords, and tenants who need fair, transparent, and independent billing.

What Changed in 2025

The latest clarification confirms that multiple meters remain allowed under WAPDA Rules 2025 when each portion functions as a separate household. The government’s focus is simple: support genuine consumers who live in distinct units while controlling slab-splitting and misuse of subsidized tariffs. If your portion is separate and you can prove it, you are eligible to apply.

Is More Than One Meter Allowed?

Yes. Multiple electricity meters are still permitted in 2025 provided the premises are divided into independent living units. The approval hinges on proof that each unit operates on its own, with separate access and wiring, so that billing is fair and transparent for everyone involved.

The Rulebook in Plain Words

Distribution companies follow the Consumer Service Manual to decide additional connections at the same premises. In practical terms, that means officials look for a separate entrance or access, a dedicated electric circuit or distribution board for the portion, a working kitchen that shows it is a self-contained household, and an affidavit confirming you are running a distinct unit. Site verification can be part of the process to confirm these conditions on the ground.

Who Benefits From This Policy

Joint families living on different floors can maintain independent bills without arguments over shared usage. Landlords and tenants can avoid disputes by installing a dedicated meter for the rented unit, which builds trust and simplifies billing. Homeowners who have created separate upper portions or basements also benefit, because they can manage costs and accountability per unit instead of relying on splitting a single bill.

Myths vs Facts (Explained Quickly)

“Only one meter per house” is a myth; additional meters are possible for separate units. “All extra meters will be removed” is false; action is taken only where setups are illegal or not truly separate. “Tenants cannot get their own meter” is wrong; tenants can apply if criteria and documents are met. “Approvals have stopped” is incorrect; approvals continue under existing rules when files are complete and the site passes verification.

Eligibility Checklist You Should Pass First

Before you submit an application, make sure your unit opens independently and does not rely on passing through someone else’s living space, that a functioning kitchen exists in your portion, that your wiring is separated with its own circuit or distribution board, that you can sign an affidavit confirming a distinct household, and that you are ready for site verification by the local DISCO team if needed. Meeting these points makes your case strong and reduces back-and-forth during processing.

How to Apply for a Second Electricity Meter (Simple Steps)

  • Visit your area DISCO office (e.g., LESCO, MEPCO, FESCO, IESCO, or K-Electric).
  • Request the New Connection / Additional Meter form.
  • Fill the form with accurate applicant and premises details.
  • Attach the required documents.
  • Submit the application and take your reference/application number.
  • Cooperate with the site inspection team when they schedule a visit.
  • Pay the approved security deposit and connection charges.
  • Wait for installation according to the normal workflow.
  • Stay available for calls or visits to avoid delays.

Documents Required (Keep Them Ready)

Prepare a CNIC copy for identity verification, proof of ownership or tenancy such as a sale deed or rent agreement to establish your legal interest, an affidavit of separate household confirming the unit’s independence, and wiring or load details if your DISCO asks for them. Some offices may also ask for a copy of a previous bill for address or feeder reference, plus any other document listed in local SOPs.

Monitoring in 2025 and What It Means for You

Authorities are reviewing cases where multiple single-phase meters are tied to the same CNIC at non-separate premises to discourage subsidized slab misuse. Genuine families and tenants do not need to worry as long as they meet the separate-unit test. The objective is to protect revenue and fairness, not to penalize lawful consumers who have followed the rules.

Practical Tips to Speed Up Approval

Photograph your separate entrance and kitchen and keep those images handy in case an officer requests quick proof during scrutiny. Label your unit’s distribution board and keep any basic wiring diagram or electrician’s note available. Ensure your tenancy agreement or ownership papers match your CNIC details or attach a short address affidavit if there is a mismatch. Be reachable for inspection appointments so your file does not go on hold.

FAQs About New Policy for Installing Multiple Electricity Meters at One Home

Can I install two meters in one house in Pakistan?

Yes, if your portion has a separate entrance, kitchen, and wiring, you can apply for an additional meter.

Is there a ban on multiple electricity meters in 2025?

No, there is no blanket ban; additional meters remain allowed for genuinely separate units.

Can tenants apply for their own electricity meter?

Yes, tenants can apply with the landlord’s approval or tenancy proof and other required documents.

What documents are needed for an additional meter?

CNIC, proof of ownership or tenancy, affidavit of separate household, and compliance with site verification and the standard charges.

Conclusion

The 2025 update brings clarity and balance: multiple electricity meters are allowed when a property contains separate households, and each unit can be billed fairly on its own. If your portion has an independent entrance, its own kitchen, and a separate electrical circuit, you meet the core test. Get your documents in order, follow the standard application steps at your DISCO, and you can secure a legal additional meter with confidence.

CM Team

CM Team at abrosh.pk shares trusted updates on 8171 payments, CM/PM schemes, and official government programs.